| ACROBAT |
|
|
YOU WILL NEED TO DOWNLOAD ACROBAT READER
FOR ALL PDF FILES |
|
|
|
|
|
|
|
|
| 1990 |
|
|
|
|
|
|
|
|
|
|
|
| 001 |
18May90 |
|
Proposal for a Cost Effective Doubling
of Existing VLBI Sensitivity |
A.R. Whitney |
|
|
|
|
|
|
|
| 002 |
23OCT90 |
|
East Coast VLBI Group The Mark IV VLBI
System - the Next Step |
A.R. Whitney |
|
|
|
|
|
|
|
| 003 |
01NOV90 |
|
Preliminary Mark IV Formatter Specification |
A.R. Whitney |
|
|
|
|
|
|
|
| 004 |
29AUG90 |
|
Comparison of OS-9 and VxWorks --- |
|
|
|
|
|
|
|
|
| 005 |
06JAN91 |
|
Another Consideration for Mark IV |
D.B. Shaffer |
|
|
|
|
|
|
|
| 006 |
08JAN91 |
|
Mark IV Formatter Spec. - Draft 2 |
A.R. Whitney |
|
|
|
|
|
|
|
| 007 |
06MAR91 |
|
Limitations in recording high frequencies
with the VLBA record electronics |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 008 |
14MAR91 |
|
TAXI Fleet for MKIV and V |
H.F. Hinteregger |
|
|
|
|
|
|
|
| 009 |
01APR91 |
|
ACL for Write Driver |
H.F. Hinteregger |
|
|
|
|
|
|
|
| 010 |
05JUN89 |
152 |
A magnetic circuit model for the VLBA
headstack |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 011 |
27DEC89 |
184 |
Wavelength Dependence of D1 and MET VLBA
"Headcurves" |
A.E.E.Rogers |
|
|
|
|
|
|
|
| 012 |
09JAN90 |
187 |
Tape Noise Measurements of D1K & S-VHS |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 013 |
30JAN90 |
190 |
A Quick Test of 8mm Evaporated Metal Tape
(MET) |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 014 |
02FEB90 |
195 |
Tests of Parallel Playback Electronics |
A.E.E. Rogers |
E.F. Nesman |
|
|
|
|
|
|
| 015 |
27JUN90 |
207 |
Measurements of record spacing loss and
numerical model to evaluate the effect of |
A.E.E. Rogers |
S. Deligeorges |
|
|
|
|
|
|
| 016 |
27JUN90 |
208 |
Tests of a method to support thick and
thin tape on a processor transport |
A.E.E. Rogers |
S. Deligeorges |
|
|
|
|
|
|
| 017 |
17JUL90 |
210 |
Tests of the VLBA Read/Write Interface |
A.E.E. Rogers |
H.F.Hinteregger |
|
|
|
|
|
|
| 018 |
17JUL90 |
211 |
Record Cross-talk Theory |
A.E.E. Rogers |
D.L. Smythe |
|
|
|
|
|
|
| 019 |
13AUG90 |
214 |
Some Tests of the TI TL592B Amplifier |
A.E.E. Rogers |
S. Deligeorges |
J. Hargreaves |
|
|
|
|
|
| 020 |
06SEP90 |
220 |
Dummy Headstack Post for Improved Tracking
Symmetry |
A.E.E. Rogers |
H.F.Hinteregger |
P. Bolis |
|
|
|
|
|
| 021 |
04OCT90 |
225 |
Preliminary report on First VLBA Tapes |
A.E.E. Rogers |
H.F. Hinteregger |
D.L. Smythe |
P.Bolis |
|
|
|
|
| 022 |
19OCT90 |
226 |
Thin Tape Facts |
H.F. Hinteregger |
|
|
|
|
|
|
|
| 023 |
30NOV90 |
228 |
Tape winding and tape thickness non- uniformity |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 024 |
04DEC90 |
229 |
Update on the AMPEX/MAXELL tape packing
problem |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 025 |
|
232 |
Edge slitting signatures and edge quality
of 16 mm tapes |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 026 |
31DEC90 |
233 |
Dynamic forces on the tape edge |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 027 |
19JAN91 |
236 |
Tape Elastic Constant Check via Tape Winding |
A.E.E. Rogers |
H.F.Hinteregger |
|
|
|
|
|
|
| 028 |
18JAN91 |
237 |
Methods of Measuring Headstack Gap Length |
A.E.E. Rogers |
H.F. Hinteregger |
|
|
|
|
|
|
| 029 |
31JAN91 |
241 |
Revised Model for VLBA Head Efficiency |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 030 |
14FEB91 |
243 |
Capacitance of Gapped Bars |
D.L. Smythe |
|
|
|
|
|
|
|
| 031 |
25FEB91 |
245 |
Efficiency variations in VLBA headstacks |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 032 |
27FEB91 |
246 |
Scanning Electron Microscope (SEM) Gap
Length Measurement |
H.F. Hinteregger |
|
|
|
|
|
|
|
| 033 |
17MAY91 |
252 |
How Head SNR Affects Reproduce Performance |
D.L. Smythe |
|
|
|
|
|
|
|
| 034 |
12JUN91 |
254 |
Calculations concerning air entrapment
at the headstack and the maintenance of good head-to-tape contact |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 035 |
10JUN91 |
256 |
Tape profile along the headstack |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 036 |
17JUN91 |
257 |
Dynamic Friction and Viscous Drag in the
Vacuum Columns |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 037 |
11JUL91 |
258 |
Write Driver Asymmetry Improvements |
V.A. Tran |
A.E.E. Rogers |
|
|
|
|
|
|
| 038 |
17JUN91 |
259 |
Head to tape contact at 320 IPS with thin
tape |
D.L. Smythe |
|
|
|
|
|
|
|
| 039 |
18JUN91 |
260 |
Performance of Mark IIIA Recorder at 56
kbpi |
D.L. Smythe |
|
|
|
|
|
|
|
| 040 |
27JUN91 |
262 |
Vacuum Column Air Bearing Clearance |
A.E.E.Rogers |
|
|
|
|
|
|
|
| 041 |
8JUL91 |
263 |
Tape Winding Dynamics |
A.E.E.Rogers |
|
|
|
|
|
|
|
| 042 |
2JUL91 |
264 |
Theoretical Model for Head Flying |
A.E.E.Rogers |
|
|
|
|
|
|
|
| 043 |
10JUL91 |
265 |
Simple method of measuring edge curl |
A.E.E.Rogers |
|
|
|
|
|
|
|
| 044 |
15JUL91 |
266 |
Thermal Calculations for High Tape Speeds |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 045 |
15JUL91 |
268 |
Slipping Capstans |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 046 |
17JUL91 |
269 |
Accelerated tape wear tests |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 047 |
12JUL91 |
270 |
VLBA Write Driver at 18 Mb/s |
D.L. Smythe |
|
|
|
|
|
|
|
| 048 |
31JUL91 |
271 |
Method of contouring heads for high tape
speeds |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 049 |
02AUG91 |
272 |
Spacing loss from uneven wear of headstacks |
A.E.E. Rogers/ |
H.F. Hinteregger |
|
|
|
|
|
|
| 050 |
23AUG91 |
273 |
Magnetic Tape "Flying" Measurements
vs Model |
A.E.E. Rogers |
J. Starr |
|
|
|
|
|
|
| 051 |
08AUG91 |
274 |
Preliminary tests of various low friction
Surfaces |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 052 |
21AUG91 |
276 |
Quality Control Checks for Inch-Worm Drivers |
D.L. Smythe |
|
|
|
|
|
|
|
| 053 |
22AUG91 |
277 |
Modifying the VLBA Head Interface for
Recording at 18 Mbs |
D.L. Smythe |
|
|
|
|
|
|
|
| 054 |
21OCT91 |
279 |
Reel Alignment Tolerance |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 055 |
23OCT91 |
280 |
Reels for thin tape |
H.F. Hinteregger |
A.E.E. Rogers |
|
|
|
|
|
|
| 056 |
30AUG91 |
281 |
Possible variations on the vacuum loop |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 057 |
17SEP91 |
282 |
Additions to head flying model and comparison
with measurements |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 058 |
25SEP91 |
283 |
Preliminary tests of new and experimental
Headstacks |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 059 |
04OCT91 |
285 |
Write Drive Improvements |
D.L. Smythe |
|
|
|
|
|
|
|
| 060 |
21OCT91 |
286 |
Head wear rates with Fotoceram spacers |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 061 |
22OCT91 |
288 |
Progress report on the solution to the
tape edges heating problem |
A.E.E. Rogers |
H.F. Hinteregger |
|
|
|
|
|
|
| 062 |
26NOV91 |
|
Mark 4 Drawings |
R. Cady |
E. Nesman |
| 063 |
27SEP91 |
267 |
Tape (thin) and transport handling procedures |
A.E.E. Rogers |
H.F. Hinteregger |
| 064 |
12FEB92 |
290 |
Configuration of Tape Path for Thin Tape
and High Speed |
H.F. Hinteregger |
A.E.E. Rogers |
|
|
|
|
|
|
| 065 |
29NOV91 |
291 |
Bar-code Reader on VLBA Transport |
A.R. Whitney |
|
|
|
|
|
|
|
| 066 |
12DEC91 |
293 |
The Effect of the Reel Hub on Tape Pack |
H.F. Hinteregger |
A.E.E. Rogers |
|
|
|
|
|
|
| 067 |
02FEB92 |
298 |
Plan for accelerated testing of thin tape |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 068 |
03MAR92 |
299 |
Tape Procurement Specification |
A.E.E. Rogers, |
H.F. Hinteregger |
|
|
|
|
|
|
| 069 |
05MAR92 |
300 |
Measured Tolerance on reel table alignment |
A.E.E. Rogers, |
H.F. Hinteregger |
|
|
|
|
|
|
| 070 |
05MAR92 |
301 |
Mechanical Upgrade Steps |
A.E.E. Rogers, |
K.M.Wilson, |
H.F. Hinteregger |
|
|
|
|
|
| 071 |
14APR92 |
|
Mark 4 Head-Numbering Conventions |
A.R. Whitney |
|
|
|
|
|
|
|
| 072 |
05MAY92 |
|
Changes to MkIII Video Converter to Extend
Bandwidth to 16 MHz |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 073 |
05FEB92 |
294 |
Septum Interference with Precision Plate |
K.M. Wilson |
|
|
|
|
|
|
|
| 074 |
18FEB92 |
296 |
Summary of Results of Thin Tape Inspections |
A.Sandler, |
H.Hinteregger, |
A.Rogers, |
N.Donald, |
D. Sousa |
|
|
|
| 075 |
12MAR92 |
302 |
Mechanical Model for Reel Table Alignment
Needed for Low Speed Running |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 076 |
10MAR92 |
303 |
Head Assembly Mounting Screws Bottoming
Out of the High Performance Damper |
D. Fields |
|
|
|
|
|
|
|
| 077 |
30APR92 |
305 |
Head Flying: Expected Changes with Head
Wear |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 078 |
05MAY92 |
306 |
Differences in the VLBA, MkIII, & MkIV
IF to Baseband Converter |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 079 |
07MAY92 |
307 |
Tolerance of Tape Clearance in Vacuum
Column |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 080 |
19MAY92 |
308 |
Tape Edge Abrasion by Contact with Reel
Flange Rims |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 081 |
12JUN92 |
|
4-Level sampling threshold sensitivity
with the Bos chip |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 082 |
15JUN92 |
|
Some Loss Factors |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 083 |
18JUN92 |
|
Pass Locations |
D.L. Smythe |
|
|
|
|
|
|
|
| 084 |
23JUN92 |
|
Channel Track Assignments |
D.L. Smythe |
A.R. Whitney |
|
|
|
|
|
|
| 085 |
27MAY92 |
310 |
More on the abrasion of tape edges by
reel flanges |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 086 |
01JUN92 |
312 |
Preliminary Tape Canister Drop Tests |
A.E.E. Rogers |
H.F.Hinteregger |
|
|
|
|
|
|
| 087 |
01JUN92 |
313 |
Some Calculations of forces experienced
by tapes during shipment |
A.E.E. Rogers |
H.F. Hinteregger |
|
|
|
|
|
|
| 088 |
15JUN92 |
316 |
Version 6 of RECON |
R.J. Cappallo |
|
|
|
|
|
|
|
| 089 |
18JUN92 |
317 |
Elastic modulus measurements for thin
tapes |
D.Callahan |
A.E.E. Rogers |
|
|
|
|
|
|
| 090 |
23JUN92 |
|
Interim Report on Correlator Chip Study
for Mark IV Correlator |
A.R. Whitney |
|
|
|
|
|
|
|
| 091 |
19JUN92 |
|
Correlator Chip Internal Data Paths |
J.I. Levine |
|
|
|
|
|
|
|
| 092 |
25JUN92 |
|
ASIC Pricing |
W. Aldrich |
|
|
|
|
|
|
|
| 093 |
16JUN92 |
|
ASIC Pricing (Again) |
W. Aldrich |
|
|
|
|
|
|
|
| 094 |
23JUN92 |
318 |
Tape loop clearance tolerance |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 095 |
25JUN92 |
319 |
Tape winding and stretched tape |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 096 |
30JUN92 |
320 |
Wear tests on short tapes |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 097 |
01JUL92 |
321 |
Factors which influence the tape wind
test |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 098 |
02JUL92 |
322 |
The effect of debris on tape packing |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 099 |
06JUL92 |
323 |
Accelerated thin tape tests: Status Report |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 100 |
13OCT92 |
|
Upgrade to Mark IV Data-Acquisition Capability |
D. Smythe |
|
|
|
|
|
|
|
| 101 |
27OCT92 |
|
Addition of acceleration to Mark IV on-chip
phase-rotor |
A.R. Whitney |
|
|
|
|
|
|
|
| 102 |
28OCT92 |
|
Correlator software documentation |
C.J. Lonsdale |
|
|
|
|
|
|
|
| 103 |
04NOV92 |
|
Reproduce at 18 Mb/s - Preliminary Results |
D.L. Smythe |
|
|
|
|
|
|
|
| 104 |
05NOV92 |
|
Delay/phase tracking in the MKIV Correlator |
A.R. Whitney |
|
|
|
|
|
|
|
| 105 |
21JUL92 |
324 |
A simple method to measure friction in
vacuum columns |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 106 |
13JUL92 |
325 |
Elastic modulus in the radial direction
for the tape |
D. Callahan |
A.E.E. Rogers |
|
|
|
|
|
|
| 107 |
23JUL92 |
326 |
Edge guiding force variation with vacuum
door clearance |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 108 |
28JUL92 |
327 |
A physical model for the effect of relative
humidity on edge |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 109 |
04AUG92 |
328 |
Humidity tests of the tape canister |
D. Callahan |
A.E.E. Rogers |
|
|
|
|
|
|
| 110 |
03AUG92 |
330 |
Capstan & Idler Alignment Tests |
A.E.E. Rogers |
K. Wilson |
|
|
|
|
|
|
| 111 |
04AUG92 |
331 |
Cost estimate for thin tape upgrade |
A.E.E. Rogers |
H.F. Hinteregger |
M.W. McDonough |
|
|
|
|
|
| 112 |
05AUG92 |
332 |
Magnetic tape surface resistivity variation
with relative humidity |
D. Callahan |
A.E.E. Rogers |
|
|
|
|
|
|
| 113 |
05AUG92 |
333 |
Thin Tape Upgrade - Changes/Additions
to VLBA Acquisition Memo #290 |
A.E.E. Rogers |
H.F. Hinteregger |
|
|
|
|
|
|
| 114 |
07AUG92 |
334 |
Influence of axis misalignment on edge
guiding force |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 115 |
26AUG92 |
335 |
Types of deposit and their dependence
on humidity |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 116 |
21AUG92 |
336 |
16 Passes with a 2 mm Guard Band |
D.L. Smythe |
|
|
|
|
|
|
|
| 117 |
23SEP92 |
339 |
Record Spacing Loss Measurement for D1
Tape |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 118 |
29SEP92 |
340 |
Accelerated thin tape tests:Status report
update |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 119 |
14OCT92 |
341 |
Failure of Ampex tape under low humidity
conditions |
A.E.E. Rogers |
H.F. Hinteregger |
|
|
|
|
|
|
| 120 |
07OCT92 |
342 |
Theoretical wear profiles for headstacks
with soft spacers |
A.E.E. Rogers |
H.F. Hinteregger |
|
|
|
|
|
|
| 121 |
27OCT92 |
|
Mark 4 Station Unit -- Preliminary Specification |
R. Cappallo |
A.R. Whitney |
|
|
|
|
|
|
| 122 |
16NOV92 |
|
Lag-dependent phase corrections |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 123 |
20NOV92 |
|
Implementation of Delay/phase tracking
in MKIV Correlator |
A.R. Whitney |
|
|
|
|
|
|
|
| 124 |
OCT92 |
001 |
NFRA-ITR 199 on Correlator Architectures
(NFRA ITR 199) |
A. Bos |
|
|
|
|
|
|
|
|
01DEC92 |
|
|
|
|
|
|
|
|
|
|
| 125 |
01DEC92 |
|
Notes on the Dual 2*2 Chip Layout |
J.I. Levine |
|
|
|
|
|
|
|
| 126 |
02DEC92 |
|
Preliminary Evaluation of a Gigabit-Rate
Chip set for Data Communication (G-Link) |
D.L. Smythe |
|
|
|
|
|
|
|
| 127 |
11DEC92 |
|
Validity Bits and Data Normalization |
B. Anderson |
|
|
|
|
|
|
|
| 128 |
05JAN93 |
|
Three correlation schemes with X and Y
validity |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 129 |
06JAN93 |
|
Summary of proposed SMA correlator architecture |
J.I. Levine |
A.R. Whitney |
|
|
|
|
|
|
| 130 |
08JAN93 |
|
Robust and Marginal Tapes:The Shape-of-Edge
Difference, Extreme Wind and Shuttle Tests, High Tg Ampex Samples
Looking good |
H.F. Hinteregger |
|
|
|
|
|
|
|
| 131 |
07DEC92 |
345 |
Update of Self-Packing Reel Specifications |
H.F. Hinteregger |
|
|
|
|
|
|
|
| 132 |
31DEC92 |
346 |
Further improvement of write driver performance |
V.A. Tran |
K.M. Wilson |
|
|
|
|
|
|
| 133 |
08JAN93 |
347 |
Digital tone extractor normalization |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 134 |
11JAN93 |
|
Haystack Head Stacks at 18 Mb/s |
D.L. Smythe |
|
|
|
|
|
|
|
| 135 |
11JAN93 |
|
Using a Single Squash Plate for Mark IV
Tape Drives |
D.L. Smythe |
|
|
|
|
|
|
|
| 136 |
16FEB93 |
|
Vernier-Delay Control for Multiplexed
Data in Correlator Array |
A.R. Whitney |
|
|
|
|
|
|
|
| 137 |
17FEB93 |
|
The Mark IV Tape Format - Revision 1.0 |
A.R. Whitney |
|
|
|
|
|
|
|
| 138 |
23FEB93 |
|
Expected correlation between sign and
magnitude bits |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 139 |
01MAR93 |
|
Redesigned 32-MHz synthesizer |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 140 |
24FEB93 |
003 |
The EVN/Mark IV Station Unit Requirements |
B. Anderson |
|
|
|
|
|
|
|
|
01MAR93 |
|
|
|
|
|
|
|
|
|
|
| 141 |
02MAR93 |
004 |
The EVN/Mark IV Station Unit: Straw-Man
Design |
B. Anderson |
|
|
|
|
|
|
|
|
24FEB93 |
|
|
|
|
|
|
|
|
|
|
| 142 |
03MAR93 |
|
Numerical Coding |
W. Aldrich |
|
|
|
|
|
|
|
| 143 |
08MAR93 |
|
Current state of postprocessing and archive
subsystem software under UNIX |
C. Lonsdale |
|
|
|
|
|
|
|
| 144 |
11MAR93 |
|
Headstack Specification for MK3A/VLBA/-
MK4 Compat |
H.F. Hinteregger |
|
|
|
|
|
|
|
| 144.1 |
|
|
Stepped and triple-cap headstack specification
for VLBI tape recorder |
H.F. Hinteregger |
|
|
|
|
|
|
|
| 144.2 |
|
|
Stepped and triple-cap headstack specification
for VLBI tape recorder |
H.F. Hinteregger |
|
|
|
|
|
|
|
| 144.3 |
03032000 |
|
Stepped and triple-cap headstack specification
for VLBI tape recorder |
H.F. Hinteregger |
|
|
|
|
|
|
|
| 145 |
27JAN93 |
349 |
Thin Tape Upgrade - Summary of Parts,
Dwgs, Assy & Test |
A.E.E. Rogers |
K.M. Wilson |
H.F. Hinteregger |
G. Peck, |
|
|
|
|
| 146 |
27JAN93 |
350 |
Version 7 of RECON |
R.J. Cappallo |
|
|
|
|
|
|
|
|
|
(see VLBA Memos 71 238)
|
|
|
|
|
|
|
|
|
|
| 147 |
30MAR93 |
353 |
Suggested BBC Oscillator Improvements |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 148 |
19MAR93 |
|
Normalization for Mark IV with Mark III
Correlator |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 149 |
31MAR93 |
|
Correlator Chip Design Review |
W.Aldrich |
|
|
|
|
|
|
|
| 150 |
27APR93 |
|
MKIII BBC AGC options for 2-bit data |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 151 |
26MAY93 |
|
Summary of 25 May 1993 Mark IV Meeting |
A.R. Whitney |
|
|
|
|
|
|
|
| 152* |
29APR93 |
|
Summary of 27 April 1993 Mark IV Meeting |
A.R. Whitney |
|
|
|
|
|
|
|
|
|
*(This is also Mark IV Internal Memo #IM11)
|
|
|
|
|
|
|
|
|
|
| 153 |
02JUN93 |
|
The Fabrication of a High Speed Cross
Point Switch |
J. Goodman |
|
|
|
|
|
|
|
| 154 |
03JUN93 |
|
Summary of 1 June 1993 Software Group
Meeting |
A.R. Whitney |
|
|
|
|
|
|
|
| 155 |
09JUN93 |
|
Summary of 8 June 1993 Mark IV Meeting |
A.R. Whitney |
|
|
|
|
|
|
|
| 156 |
04AUG93 |
363 |
Performance maintenance and head wear |
H.F. Hinteregger |
|
|
|
|
|
|
|
| 157 |
24MAY93 |
356 |
Methods for further reduction in head
flying and Head Wear |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 158 |
26JUL93 |
358 |
Tape Packing at Low Tensions |
A.E.E. Rogers |
C. Lam |
|
|
|
|
|
|
| 159 |
02AUG93 |
360 |
Simple method of checking reel motor torque |
A.E.E. Rogers |
|
|
|
|
|
|
|
|
09AUG93 |
|
Revision |
|
|
|
|
|
|
|
|
| 160 |
02AUG93 |
361 |
Reel servo stability margin |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 161 |
02AUG93 |
362 |
An evaluation of the Jodrell bank headstacks |
A.E.E. Rogers |
P.G. Bolis |
H.F. Hinteregger |
|
|
|
|
|
| 162 |
12AUG93 |
365 |
Preliminary tests of modified "triple
cap" contour |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 163 |
01SEP93 |
368 |
Wear rates, head flying and performance
of the current head design at various operating tensions |
C. Lam |
|
|
|
|
|
|
|
| 164 |
07SEP93 |
369 |
Wear rates for heads fotoceram and MN130
spacer materials |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 165 |
10SEP93 |
|
Summary of Mark IV-related meetings -
week of 7 September 1993 |
A.R. Whitney |
|
|
|
|
|
|
|
| 166 |
16SEP93 |
370 |
Test procedure for R131 Read Modules and
R132 Parallel Reproduce Modules |
D.L. Smythe |
P.G. Bolis |
|
|
|
|
|
|
| 167 |
24SEP93 |
371 |
Reel Servo/Driver Configuration and Margin
Analysis Recommendations for More Reliable Operation at 320 ips
Maximum |
H.F. Hinteregger |
|
|
|
|
|
|
|
| 168 |
14SEP93 |
|
A-file format and related issues |
C.J. Lonsdale |
|
|
|
|
|
|
|
| 169 |
22OCT93 |
|
Transmission Line Simulator Tests |
J.I. Levine |
|
|
|
|
|
|
|
| 170 |
22OCT93 |
|
MKIV Root File Formats |
C.J. Lonsdale |
|
|
|
|
|
|
|
| 171 |
22OCT93 |
|
MK4 Formatter FPGA Configuration Control |
J.I. Levine |
|
|
|
|
|
|
|
| 172 |
22OCT93 |
014 |
Mark4/EVN Data Distribution Network Simulation |
J.I. Levine |
|
|
|
|
|
|
|
| 173 |
22OCT93 |
|
Linkdata program and AFIO library changes |
C.J. Lonsdale |
|
|
|
|
|
|
|
| 174* |
05OCT93 |
012 |
Hardware Interface Specification Correlator
Input Board to Backplane |
D.L. Smythe |
A. Bos |
|
|
|
|
|
|
| 174.2* |
21MAR94 |
|
REVISED (REPLACES MK4 MEMO #195) |
|
|
|
|
|
|
|
|
| 175 |
07APR94 |
|
System Data Interface Specification |
|
|
|
|
|
|
|
|
| 176 |
28MAR91 |
248 |
Proposed phase cal extractor for upgraded
formatter A/D board |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 177 |
01APR93 |
249 |
Proposed redesign of the formatter A/D
buffer module |
A.E.E. Rogers |
E.F. Nesman |
|
|
|
|
|
|
| 178 |
27OCT93 |
017 |
Notes of Mark IV Station-Unit Phase-Calibration
Tone Extraction |
A.R. Whitney |
R.J. Cappallo |
E.F. Nesman |
|
|
|
|
|
| 179 |
27OCT93 |
016 |
Detailed format of Mark III and Mark IV
track- frame header |
A.R. Whitney |
|
|
|
|
|
|
|
| 180 |
03NOV93 |
|
PLL Clock Driver Timing |
J.I. Goodman |
J.I. Levine |
|
|
|
|
|
|
| 181 |
05NOV93 |
021 |
Correlator-Board Backplane-Interface Signal
Requirements |
W.H. Aldrich |
J.I. Goodman |
|
|
|
|
|
|
| 182 |
01OCT93 |
006A |
The EVNFRA Correlator: Design Considerations |
A. Bos |
|
|
|
|
|
|
|
|
|
|
NFRA-ITR 202 (Revision1) |
|
|
|
|
|
|
|
|
| 183 |
15MAR93 |
005 |
DZB and EVN Correlator Data Distribution
Study NFRA Note 612 |
R.P. Millenaar |
|
|
|
|
|
|
|
| 184 |
23NOV93 |
023 |
Header Data Format |
W.A. Aldrich |
|
|
|
|
|
|
|
| 185 |
23NOV93 |
|
Revised Head Block Design |
H.F. Hinteregger, |
A.E.E. Rogers, |
D.L. Smythe |
|
|
|
|
|
| 186 |
20OCT93 |
372 |
Contours of "Triple-cap"-Heads |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 187 |
23NOV93 |
375 |
Model for recorder tracking response to
capstan and idler surface irregularities |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 188 |
24NOV93 |
|
Increasing the band-width of the Mark
IV preamplifier to MHz |
D.L. Smythe |
|
|
|
|
|
|
|
| 189 |
11JAN94 |
|
Upgrades to video converters for 16 MHz
bandwidth |
A.E.E. Rogers |
|
|
|
|
|
|
|
| 189.1 |
10JUN94 |
|
Revision 1 |
|
|
|
|
|
|
|
|
| 190 |
22NOV93 |
|
Clock Signal from SMA Data Receivers |
J.I. Levine |
|
|
|
|
|
|
|
| 191 |
29DEC93 |
031 |
Correlator Board Hardware Specification |
J.I. Goodman |
|
|
|
|
|
|
|
| 192 |
12JAN94 |
|
Summary of VLSI chip-simulation Meeting |
A.R. Whitney |
|
|
|
|
|
|
|
| 193 |
08FEB94 |
|
Correlator Board Software Development |
J.I. Goodman |
|
|
|
|
|
|
|
| 194 |
11FEB94 |
|
System-level diagrams for the weak-minded |
A.R. Whitney |
|
|
|
|
|
|
|
| 195 |
14FEB94 |
|
Hardware Interface Specification Correlator
Input Board to Backplane |
D.L. Smythe |
|
|
|
|
|
|
|
| 174.2* |
21MAR94 |
|
***REPLACED BY REVISED MK4 MEMO #174.2, |
|
|
|
|
|
|
|
|
| 196 |
14FEB94 |
038 |
PBU Interface to the SU and the CCC |
R.J. Cappallo |
|
|
|
|
|
|
|
| 197 |
20JAN94 |
|
Distributing data without a Data Distributor |
D.L. Smythe |
|
|
|
|
|
|
|
| 198 |
15DEC94 |
039 |
Serial Link Interface Specification |
D.L. Smythe |
|
|
|
|
|
|
|
| 199 |
17FEB94 |
|
New A-file format |
C.J. Lonsdale |
|
|
|
|
|
|
|
| 200 |
24FEB94 |
040 |
PBU to SU Hardware Interface Specification |
D.L. Smythe |
|
|
|
|
|
|
|
| 201 |
21MAR94 |
|
New Timing Requirements for DATA to the
Correlator Board |
D.L. Smythe |
J.I. Goodman |
|
|
|
|
|
|
| 202 |
01APR94 |
|
Some of the results of the "post-mortem"
performed on Headstack E80 |
P. Bolis |
|
|
|
|
|
|
|
| 203 |
14MAR94 |
379 |
Recovery of Shock-Deformed Tape |
H.F. Hinteregger |
D.L. Smythe |
|
|
|
|
|
|
| 204 |
03JUN94 |
|
Crosspoint Switch Functional Tests |
J.I. Levine |
|
|
|
|
|
|
|
| 205* |
12JUL94 |
|
Mark IV Tape Format, Recording Modes & Compatibility |
A.R. Whitney |
|
|
|
|
|
|
|
| 205.2* |
19DEC94 |
|
*205.2-6 has been superceded by Mark IV
Memo #230 |
|
|
|
|
|
|
|
|
| 205.3* |
06MAR95 |
|
|
|
|
|
|
|
|
|
|
| 205.4* |
24MAR95 |
|
|
|
|
|
|
|
|
|
|
| 205.5* |
04APR95 |
|
|
|
|
|
|
|
|
|
|
| 205.6* |
04JUN95 |
|
|
|
|
|
|
|
|
|
|
| 206 |
12AUG94 |
|
Correlator Back Plane Switching #81 Submillimeter
Array Technical Memorandum |
A. Dowd |
|
|
|
|
|
|
|
| 207 |
18AUG94 |
|
Crate Controller to Correlator Board Software
Interface |
J. Goodman |
|
|
|
|
|
|
|
| 207.1 |
28JUL95 |
|
|
|
|
|
|
|
|
|
|
| 208 |
24AUG94 |
|
Software Development Tasks for the HP
742 crate controller |
N. Sitkoff |
J. Goodman |
|
|
|
|
|
|
| 209 |
14SEP94 |
|
Timing of Clock, Data, BOCF, and Control
Signals at Correlator Backplane Pins |
J. Goodman |
|
|
|
|
|
|
|
| 209.1 |
12DEC94 |
|
|
|
|
|
|
|
|
|
|
| 210 |
28SEP94 |
384 |
Measurements of Recorder Head Profiles
and Changes in the Profile with Tape Speed |
S. Gross |
A.E.E. Rogers |
H.F. Hinteregger |
|
|
|
|
|
| 211 |
07NOV94 |
|
Strategies in searching for "TOT" |
R.J. Cappallo |
A.R. Whitney
|
|
|
|
|
|
|
| 212 |
31JAN95 |
|
The `Haystack' 66x64 Crossbar Switch |
J. Goodman |
|
|
|
|
|
|
|
| 213 |
25MAR95 |
388 |
Much Better than Expected Thin-film MR
Head Performance Observed |
H.F. Hinteregger |
|
|
|
|
|
|
|
| 214 |
22FEB95 |
|
Correlator Board Data and Configuration
Management |
A.R. Whitney |
|
|
|
|
|
|
|
| 215 |
10MAY95 |
390 |
Modelling and Evaluation of the Current
Headstack |
S. Müftü |
|
|
|
|
|
|
|
| 216 |
09MAY95 |
391 |
The Effect of Air Flow and Tension on
the Exit Side Behavior of a Flat Contoured Recording Head |
S. Müftü |
|
|
|
|
|
|
|
| 217 |
26MAY95 |
|
Meeting with Navell |
A.R. Whitney |
|
|
|
|
|
|
|
| 218 |
30MAY95 |
|
Meeting with Corwil |
A.R. Whitney |
|
|
|
|
|
|
|
| 219 |
02JUN95 |
|
Adding Application Specific Software Routines
To Core DSP Software |
J. Goodman |
|
|
|
|
|
|
|
| 219.1 |
28JUL95 |
|
|
|
|
|
|
|
|
|
|
| 219.2 |
01MAY96 |
|
|
|
|
|
|
|
|
|
|
| 220 |
26APR95 |
|
Correlator Chip Pipeline Defect |
W. Aldrich |
|
|
|
|
|
|
|
| 221 |
28MAR94 |
|
Derivation of Linear and Quadratic Fits
to an Input Spline Polynomial |
R. Cappallo |
|
|
|
|
|
|
|
| 222 |
02NOV94 |
|
Station Unit Spline Polynomial Evaluation |
R. Cappallo |
|
|
|
|
|
|
|
| 223 |
24AUG95 |
|
SYSTICK Generator |
D.L. Smythe |
|
|
|
|
|
|
|
| 224 |
14SEP95 |
|
System Sync Generator |
D.L. Smythe |
|
|
|
|
|
|
|
| 225 |
14DEC93 |
|
CMOS Correlator Preliminary Revision 0.03 |
J. Canaris |
W. Aldrich |
|
|
|
|
|
|
| 226 |
10JUN93 |
|
The Haystack VLSI Correlator Chip Preliminary |
W. Aldrich |
A.R. Whitney |
|
|
|
|
|
|
| 227 |
01SEP95 |
|
Input Board Functional Description Preliminary |
W. Aldrich |
|
|
|
|
|
|
|
| 227.1 |
01DEC95 |